The Livingston Parish Government initiated the 2021 Road Improvement Plan to improve roadway drivability and safety. The cumulative cost of the plan exceeded $7 million and included 35 roads. Construction activities range from simple drainage culvert replacement and rehabilitation to full-scale road demolition and replacement. This investment in the parish infrastructure created an improvement to almost 100,000 feet of roadway and ensuring residents the ability to see and enjoy a better and safer driving experience.
Premier Geotech and Testing's services included: Geotechnical exploration, drilling, and laboratory testing, concrete and asphalt coring, soil-cement stabilization determinations, full-time resident inspection, density testing, proof roll inspections, and monitoring lime treatment and soil-cement stabilization operations.
Comments