The Baton Rouge Clinic is expanding their existing facility to provide space for the addition of a new MRI machine. The added space will be located near the rear of the existing facility and will comprise approximately 2,000 square feet. This will be a single-story addition found on a deep foundation system and will be tied into the existing facility providing positive integration and a seamless patient experience.
Premier Geotech and Testing provided geotechnical exploration, drilling, engineering, drilled shaft installation monitoring, pile load test, proof roll inspection, nuclear density testing, utility installation monitoring and testing, concrete placement monitoring, sampling, and testing, and associated laboratory testing.
Comments